EXCAVATION FOR BASEMENT / FOOTING / TRENCHES
Excavation work Excavation work Excavation work Excavation work EXCAVATION FOR BASEMENT / FOOTING / TRENCHES 1. OBJECTIVE: The objective of this method statement is to carry out the Excavation works by meeting the technical specification and complying with Standards. 2. SCOPE: The scope of this method statement includes at all areas at CTSIL, CTSIL site while executing it in accordance with Technical specifications. 3. REFERENCE · IS-Codes · Technical Specification 4. TOOLSAND TACKLES · Trowel, · Total Station, · Excavator, · Tipper, · ...