Posts

WATER PROOFING WORK - METHOD STATEMENT

 WATER PROOFING WORK -  METHOD STATEMENT 1.     OBJECTIVE: The objective of this method statement is to carry out the Water-proofing Works by meeting the technical specification and complying with Standards. 2.     SCOPE: The scope of this method statement includes at all areas at CTSIL, CTSIL site while executing it in accordance with Technical specifications. 3.     REFERENCE   ·          IS-Codes ·          Technical Specification 4.     TOOLS AND TACKLES ·          Preprufe100S, ·          Bitustik ™ 4000, ·          Bituthene 4000, Roller, ·          2 to 3m- Measuring tape, ·          Cuttter. 5.  ...

GRANITE AND MARBLE WORKS - METHODOLOGY STATEMENT

 GRANITE AND MARBLE WORKS -  METHODOLOGY STATEMENT Granite Flooring 1.     OBJECTIVE: The objective of this method statement is to carry out the Granite and Marble Works by meeting the technical specification and complying with Standards. 2.     SCOPE: The scope of this method statement includes at all areas at CTSIL, CTSIL site while executing it in accordance with Technical specifications. 3.     REFERENCE   ·          IS-Codes ·          Technical Specification 4.     TOOLS AND TACKLES ·          Trowels ·          Line Dori ·          Tube level ·          Plumb bob ·          Measurement Tape ·   ...